Río Blanco Project

Timeline of the Río Blanco Project

Discover the mining site

1994

The titling process for 35 mining concessions is initiated, encompassing a total area of 28,267.84 hectares. Support for MAJAZ

2003
2005

RBC acquires 35 mining concessions, amounting to a total of 28,267.84 hectares (approximately 69,850 acres)

2007

On June 30, Río Blanco decided to relinquish 18 concessions, representing a total of 14,623.65 hectares

*This responsible decision was made as the 18 concessions were located within the páramo zone, a highly sensitive ecosystem*

2015

As of now, we hold only 17 concessions, representing a total area of 13,644.14 hectares.

2025

Río Blanco is a project for the exploration and development of copper and molybdenum.

The Río Blanco Project is a copper and molybdenum deposit to be exploited via open-pit mining, representing one of the most significant natural resources in the Piura region.

The mining site
Mining Type
Open-pit
Minerals
Copper and Molybdenum
Ore with low impurities
It is free of contaminant elements, including arsenic.
Useful life
Estimated useful life: 20 years

At what stage is the project currently?

 Prospección

Prospecting

Exploración

Mineral Exploration

AQUÍ NOS ENCONTRAMOS Pre factibilidad

Current Stage: Pre-Feasibility

Phase of studies and project re-evaluation

Factibilidad

Feasibility

Consulta previa

Preliminary Consultation

EIA, Approvals, Permits, and Public Participation

Construcción

Construction

Operación

Operations

Closure of the Mine

Project Location and Its Interaction with Natural Ecosystems

Advantages of the Río Blanco Project

What is the expected number of jobs created by the project?

 

  • In Pre-construction period The project will create over 1,000 direct jobs and more than 6,000 indirect employment opportunities.
  • In the construction phase, the project is expected to generate over 5,000 direct jobs and more than 30,000 indirect employment opportunities.
  • During the operational phase, the project is expected to generate over 1,200 direct jobs and more than 7,200 indirect employment opportunities.

In what ways could the Río Blanco project help enhance water resource availability?

The Rio Blanco Project It will drive the construction of water reservoirs. providing benefits to the communities of Ayabaca and Huancabamba.

What have we achieved?

  • Investment in Water Storage Infrastructure
  • Enhancing water conservation and distribution.
  • Extension of the agricultural zone
  • Deployment of advanced irrigation systems, among other measures.